 |
|
| Communication within our shipping department is the key to our 100% on-time delivery record | |
 |
|
| One of many digital inspection gauges that are wired for SPC data gathering | |
 |
|
| Multiple parts can be machined from one block, dramatically reducing handling time | |
 |
|
Lean Manufacturing: To reduce WIP, parts are tumbled through multiple fixtures to produce a finished part in one set-up | |
 |
|
| Our quality department is equipped with the latest analytical technologies | |
 |
|
| Keeping cutters and parts at a consistent temperature helps to control accuracy | |
 |
|
| We continually update our equipment to ensure that we are using the fastest and most accurate equipment available | |
 |
|
| We often use special fixtures and techniques to increase productivity | |